Six measures facilitate flexible
and rapid production changeover
Rapid changeover for flexible production lines
Rapid changeover for flexible production lines
Six measures facilitate flexible and rapid production changeover
These six measures—priority scheduling strategy for the same specification/color/material, automatic loading of process formulas, material kitting, non-stop equipment color change, QR code scanning for automatic matching & material feeding, and mold replacement—combined with accurate material transportation by AGVs, enhance the capability of "flexible production changeover".
Six measures enhance the capability of "flexible production changeover"

(图1)

Typical smart manufacturing scenarios in the cable industry
Covering diverse samrt manufacturing scenarios from production to management
Share

Stock code

874642

Current price

-

Today's percentage change

-
Please fill in your requirements

Your requirements*

Submit